Schemes Proposed
1.Upfront Payment: Rs.6,000/-
Registration Charges (Non-Refundable) NIL
SD against equipment (Refundable) Rs.5,000/-*
SD against consumption (Refundable) Rs.1,000/-
2. EMI Scheme Total Rs.6,354/-
Registration Charges (Non-Refundable) Rs.300/- + 18% GST = Rs.354/- (Upfront at the time of Registration)
SD against consumption (Refundable) Rs.1,000/- (Upfront at the time of Registration)
SD against equipment (Refundable) Rs.500/- bi-monthly recovered through Gas Bills till recovery of Rs.5,000/-*
3. Rental Cum FDC (Fixed Daily Charges) Rs.1,354/- Upfront + Rentals
Registration Charges (Non-Refundable) Rs.300/- + 18% GST = Rs.354/- (Upfront at the time of Registration)
SD Against consumption (Refundable) Rs.1,000/- (Upfront at the time of Registration)
SD against equipment (Refundable) NIL
Rental cum FDC (Non-Refundable) Re.1.00 per day + 18% GST = Rs.1.18/- per day to be recovered through Gas Bills till the connection is live with GGL

In addition to the above schemes, four burner gas appliance conversion shall be free of cost if done within one month of date of Gas RFC.